Contact:
|
Stephanie Gunter
|
PreBid Date:
|
08/14/2003
1400
|
PreBid Info:
|
|
|
Company:
|
Walton Construction Company Inc. - KCMO
|
Bid Date:
|
08/28/2003
1500
|
Bid Info:
|
|
|
|
Public Notes:
|
This work generally includes, but is not limited to: Surveying, Earthwork. Drilled Piers, Cast-in place Concrete (including Architectural), Plant-Precast Concrete (Architectural & Structural), Unit Masonry Assemblies, Pipe & Tube Railings, Misc. Steel, Sheet metal/flashing, Joint Sealants, Steel Doors & Frames, Aluminum-Framed Entrances and Storefronts, Door Hardware, Glazing, Painting, Hydraulic Elevators, Mechanical (HVAC & Plumbing), Electrical, Fire Alarm, Fire Sprinkler System, Retaining Walls, Striping Signage, etc.
|
|
Job Purchase Information:
|
Sets of Bidding Documents may be obtained from Kelly Imaging for a Refundable fee of $75.00 per set if plans are returned to Kelly Imaging in good condition by September 15, 2003. Make checks payable to Walton Construction. Mail checks to: Kelly Imaging, Attn: Distribution, 10840 W 86th Street, Lenexa, KS 66214-1632.
|
|
Addenda- 08/21/2003 - Addendum 1 ? Consists of 41 pages of 8 1/2 x 11. This addenda is available to View, Print, Download or Pick-up at Kelly Imaging.
- 08/22/2003 - Addendum #2 ? Consists of 1 page of 8 1/2 x 11. This Addenda alters the bid date to August 28, 2003 at 3:00 pm. This addenda is available to View, Print, Download or Pick-up at Kelly Imaging.
- 08/26/2003 - Addendum 3 ? Consists of 9 pages of 8 1/2 x 11. This addenda is available to View, Print, Download or Pick-up at Kelly Imaging.
|
|
|
|