Contact:
|
Heidi Thummel
|
PreBid Date:
|
11/07/2003
10:00
|
PreBid Info:
|
|
|
Company:
|
GBA
|
Bid Date:
|
11/21/2003
14:00
|
Bid Info:
|
|
|
|
Public Notes:
|
Replacement of existing eight (8?) inch vitrified clay pipe and installing 750 lineal feet of ten (10?) inch pipe along the same alignment; Replacement of existing eight (8?) inch cast iron pipe and installing 653 lineal feet of ten (10?) inch pipe along the same alignment; Trenchless replacement of 95 lineal feet of eight (8?) inch vitrified clay pipe along the same alignment; Trenchless replacement of 538 lineal feet of eight (8?) inch cast iron pipe along the same alignment; Installation of 67 lineal feet of 10? pipe on new alignment; Install one (1) - 5? dia. Inside drop manhole; Install three (3) - 4? dia. standard manholes; Install one (1) inside drop on an existing manhole; and Install 57 vertical feet of cementitious manhole liner on 4? dia. Manholes.
|
|
Job Purchase Information:
|
Sets of Bidding Documents may be obtained from Kelly Imaging for a Non-Refundable fee of $70.00 per set. Make checks payable to George Butler & Associates, Inc. Mail checks to: Kelly Imaging, Attn: Distribution, 10840 W 86th Street, Lenexa, KS 66214-1632.
|
|
Addenda- 11/17/2003 - Addendum 1 ? Consists of 3 pages of 8 1/2 x 11. This addenda is available to View, Print, Download or Pick-up at Kelly Imaging.
|