Construction of a new 20,400 sf furniture retail facility.
Work includes: Earthwork, Utilities, Asphalt Pavement, Landscaping, Irrigation, Concrete Sidewalks, Curb and Gutter, Concrete Slab and Foundation, Precast Wall Panels, Brick Veneer, Cultured Stone Veneer, Structural Steel Frame, Miscellaneous Rough Carpentry and Sheathing, Thermoplastic Membrane Roofing, Concrete Tile Roofing, Flashings and Steel Metal, EIFS, Joint Sealants, Doors, Frames and Hardware, Aluminum Storefront, Glazing, Painting, Concrete Staining, Metal Stud Framing, Drywall, Acoustical Ceilings, Resilient Flooring and Carpet, Toilet Partitions, Toilet Accessories, Fire Extinguishers, Fire Sprinkler, Plumbing, HVAC, Electrical.
|