|
Contact:
|
Heidi Thummel
|
PreBid Date:
|
11/05/2003
11:00
|
PreBid Info:
|
|
|
Company:
|
GBA
|
Bid Date:
|
11/26/2003
10:00
|
Bid Info:
|
|
|
|
Public Notes:
|
The bid opening for this project has been delayed until November 26, 2003 at 10:00 a.m.
This project includes but is not limited to the installation of the following: asphalt parking lot and access road, PVC-coated chain-link fence and gates, 36" ductile iron sanitary sewer pipe, stormwater pipe and structures, electrical building, electrical system improvements, packaged engine generator, solids handling unit, odor control units (2). Also included in the project are modifications to existing clay lined flow holding basin, site demolition, revisions to existing concrete structures, mechanical system improvements, streambank stabilization, erosion control, landscaping, seeding, sodding, and site restoration.
|
|
Job Purchase Information:
|
Sets of Bidding Documents may be obtained from Kelly Imaging for a Non-Refundable fee of $175.00 per set. Make checks payable to George Butler Associates, Inc. Mail checks to: Kelly Imaging, Attn: Distribution, 10840 W 86th Street, Lenexa, KS 66214-1632.
|
|
Addenda- 11/13/2003 - Addendum 1 ? Consists of 50 pages of 8 1/2 x 11 and 4 pages of full size drawings. This addenda is available to View, Print, Download or Pick-up at Kelly Imaging.
- 11/18/2003 - Addendum 2 ? Consists of 11 pages of 8 1/2 x 11. This addenda is available to View, Print, Download or Pick-up at Kelly Imaging.
|
|
|
|