|
Contact:
|
Michael Fisher
|
PreBid Date:
|
07/08/2004
1330
|
PreBid Info:
|
|
|
Company:
|
Waters Edge Aquatic Design
|
Bid Date:
|
07/15/2004
1100
|
Bid Info:
|
|
|
|
Public Notes:
|
Construction of Phase 1 - Pool Improvements to the Brit Spaugh facility located in Great Bend, Kansas.
Project Description: Provide a water play structure previously selected by Owner and construction of a swimming pool basin, pool water treatment equipment, and site improvements.
|
|
Job Purchase Information:
|
Distribution of Bidding Documents will be through Waters Edge Aquatic Design, 9812 Pflumm Rd, Lenexa, KS. Distribution Contact: Cindy Guerra 913-438-4338.Bidding Documents will be distributed upon receipt of cash or check made payable to Waters Edge Aquatic Design in the amount of $85.00 for one set. A partial refund of $25.00 will be returned to planholders returning bid documents, in good condition to Water's Edge Aquatic Disign, within 30 days of the bid date.
|
|
Addenda- 07/08/2004 - Addendum #1 ? Consists of 29 pages of 8 1/2 x 11 and 1 page of full size drawings. This addenda is available to View, Print, Download or Pick-up at Kelly Imaging.
- 07/13/2004 - Addendum #2 ? Consists of 17 pages of 8 1/2 x 11. This addenda is available to View, Print, Download or Pick-up at Kelly Imaging.
|
|
|
|