|
Contact:
|
Heidi Thummel
|
PreBid Date:
|
Not furnished
|
PreBid Info:
|
There will not be a pre-bid conference held for this project.
|
|
Company:
|
GBA
|
Bid Date:
|
02/21/2006
14:00
|
Bid Info:
|
|
|
|
Public Notes:
|
The work under this Contract consists of the following: associated site work, material, equipment, and labor necessary for the installation of wastewater pump station structures, associated piping and conduit, wiring, instrumentation and controls, engine generator and automatic transfer switch, jib crane, 1.0 millon gallon bolted steel storage tank, 250 linear feet of 36-inch duxtile iron sanitary sewer, 7,955 linear feet of 14" ductile iron force main, asphalt access road and parking lot, erosion control, and all other appurtenances necessary to complete the project.
The pump station and force main project is located east of Gardner Road and north of 167th Street in Gardner, Kansas.
|
|
Job Purchase Information:
|
Sets of Bidding Documents may be obtained from Kelly Imaging for a Non-Refundable fee of $250.00 per set. Make checks payable to George Butler Associates. Mail checks to: Kelly Imaging, Attn: Distribution, 10840 W 86th Street, Lenexa, KS 66214-1632. Interested parties can review project related data, including the current plan holders list, by visiting the Kelly Imaging web site at www.kellyimaging.net.
Half sized (12" x 18") drawings may be purchased in addition to the contract documents and full sized drawings for an additional $35.00. Orders for half sized drawings without the purchase of a full set of contract documents will not be accepted.
|
|
Addenda- 02/14/2006 - Addendum #1 - Consists of 49 pages of 8 1/2 x 11.
- 02/17/2006 - Addendum #2 - Consists of 8 pages of 8 1/2 X 11.
|
|
|
|