|
Contact:
|
Sally Fenner
|
PreBid Date:
|
10/08/2002
|
PreBid Info:
|
|
|
Company:
|
North Kansas City Schools
|
Bid Date:
|
10/15/2002
14:00
|
Bid Info:
|
|
|
|
Public Notes:
|
This project will be awarded to a General Contractor.JE Dunn is the Program Manager, Pat Dunn is the Project Manager and can be reached at 816-391-2643. Charles James at ACI is the Project Architect and can be reached at 913-338-2300, Chris Albright at Smith & Boucher is the MEP Engineer and can be reached at 913-345-2127. The project consists of construction to Oakwood Manor School located at 5900 N Flora Avenue, Gladstone, MO. The work as described by the drawing and specifications includes in general terms, but not limited to: Installation of new underground electrical service and replacement of existing electrical switchgear; installation of new acoustical grid ceilings; replacement of some existing acoustical grid ceilings; replacement of existing window systems with new windows and stud wall/EIFS systems; replacement of certain exterior entry systems with new doors and frames; remodeling of the existing office area: miscellaneous painting; replacement of carpet; removal of boiler and existing heating systems; installation of new HVAC system; upgrade domestic hot water system; replacement of lighting fixtures; upgrade intercom and fire alarm systems; and all other work indicated on the drawings and included in the specifications. Meadowbrook School is located at 6301 N Michigan Drive in Gladstone, MO. The work as described by the drawings and specifications includes in general terms, but not limited to: Installation of new underground electrical service and replacement of existing electrical switchgear; construct two building additions;the first is a two classroom addition and the second is a new Administration Office, site grading and fill placement for new addition; concrete sidewalks; revision/relocation of existing asphalt driveway; minor landscaping at the addition; remodel existing Administrative Office; installation of acoustical grid ceiling; replacement of existing window systems with new windows and stud wall/EIFS systems; replacement of certain exterior entry systems with new doors and frames; replacement of glass and louvers in corridor walls; miscellaneous painting; removal of boiler and existing heating systems; installation of new HVAC system; replacement of lighting fixtures; and all other work indicated on the drawings and included in these specifications., This project will be awarded to a General Contractor.JE Dunn is the Program Manager, Pat Dunn is the Project Manager and can be reached at 816-391-2643. Charles James at ACI is the Project Architect and can be reached at 913-338-2300, Chris Albright at Smith & Boucher is the MEP Engineer and can be reached at 913-345-2127. The project consists of construction to Oakwood Manor School located at 5900 N Flora Avenue, Gladstone, MO. The work as described by the drawing and specifications includes in general terms, but not limited to: Installation of new underground electrical service and replacement of existing electrical switchgear; installation of new acoustical grid ceilings; replacement of some existing acoustical grid ceilings; replacement of existing window systems with new windows and stud wall/EIFS systems; replacement of certain exterior entry systems with new doors and frames; remodeling of the existing office area: miscellaneous painting; replacement of carpet; removal of boiler and existing heating systems; installation of new HVAC system; upgrade domestic hot water system; replacement of lighting fixtures; upgrade intercom and fire alarm systems; and all other work indicated on the drawings and included in the specifications. Meadowbrook School is located at 6301 N Michigan Drive in Gladstone, MO. The work as described by the drawings and specifications includes in general terms, but not limited to: Installation of new underground electrical service and replacement of existing electrical switchgear; construct two building additions;the first is a two classroom addition and the second is a new Administration Office, site grading and fill placement for new addition; concrete sidewalks; revision/relocation of existing asphalt driveway; minor landscaping at the addition; remodel existing Administrative Office; installation of acoustical grid ceiling; replacement of existing window systems with new windows and stud wall/EIFS systems; replacement of certain exterior entry systems with new doors and frames; replacement of glass and louvers in corridor walls; miscellaneous painting; removal of boiler and existing heating systems; installation of new HVAC system; replacement of lighting fixtures; and all other work indicated on the drawings and included in these specifications.
|
|
Job Purchase Information:
|
Bidders may obtain bid documents from Kelly Imaging for a refundable deposit of $100.00 per set. Make checks payable to: North Kansas City Schools. Mail checks to: Kelly Imaging, Attn: Distribution, 10840 W 86th Street, Lenexa, KS 66214-1632. Plans must be returned within 15 days of bid date in good condition for refund.
|
|
Addenda- 10/08/2002 - Addendum #1- Prints & Specs are available at Kelly Imaging for pickup.
|
|
|
|