CAS Construction was the apparent low bidder on this project.
This contract will include but not be limited to furnishing all equipment, materials, supervision, and labor required for: Demolition, modification and disposal of the existing pump station structures. Site work, material, equipment, and labor associated with the installation of wastewater pump station structures, associated piping and conduit, wiring, controls, engine generator and automatic transfer switch, 60 linear feet of 24-inch gravity sewer, 115 linear feet of 18-inch gravity sewer, 35 linear feet of 8-inch gravity sewer, two (2) 8?-0? diameter precast concrete manholes, one to be used as a junction structure with a stainless steel basket screen, 470 linear feet of 12-inch force main, 2-inch Type K copper water main, fencing and gates, asphalt and gravel access road and gravel parking lot. erosion control; site restoration; and all other appurtenances necessary to complete the project.
|