Work consists of renovating the (5) story tower portion of the Midland Theatre Building. This portion of the building fronts Main Street and will be renovated to a "white box". Scope of Work: Selective Demolition, Building Concrete, Site Concrete, Masonry,
Masonry Restoration, Misc. Steel Fabrication and Erection, Rough Carpentry, Sheet Waterproofing, Fluid Applied Waterproofing, Joint Sealants, Roofing, Doors/Frames/Hardware, Historic Steel Window Restoration, Historic Wood Window Restoration and Replacement, Glazing, Drywall, Plaster Repair, Painting, Ceramic Tile, Elevators, Platform Lifts, Fire Protection, Plumbing, HVAC, & Electrical. This is a prevailing wage project. We will be conducting walk throughs at the following times for the project on Wednesday, December 6, 2006. 9:00AM - Demolition, Concrete, Masonry Restoration, Steel Fabrication, Steel Erection 11:00AM - Roofing, Waterproofing, Joint Sealants, Glass and Glazing, Windows 1:00PM - Drywall, Plaster, Painting 3:00PM - Site Utilities, Vertical Transportation, Fire Protection, Plumbing, Mechanical, Electrical.
|