Contact:
|
John Thompson
|
PreBid Date:
|
Not furnished
|
PreBid Info:
|
|
|
Company:
|
McDonalds USA LLC
|
Bid Date:
|
06/04/2008
14:00
|
Bid Info:
|
|
|
|
Public Notes:
|
1. Refer to "additional scope" worksheet in this excel spreadsheet and incorporate all the items that are listed. Place them in respective CSI number. If you are unsure where to place item, please contact Renee Riggs for guidance.
2. Provide dumpster cost for debris generated by seating and décor, kitchen package and Fullerton (if applicable), if not in your bid already.
3. Tile note, if pricing goes above s.f. pricing listed on additional scope sheet, please put difference on following lines:
Floor tile 09.30.16.12
Wall tile 09.30.13.12
For example, base tile price for dining floor tile is $8.70, if tile selected is $9.70, you would put sq. ft. times $8.70 on line 09.30 the difference ($1.00 times sq. ft.) would go on line 09.30.16.12
4. Fire supression required for this building per drawings.
5. Contractor to include road improvements in bid.
6. Contractor to include sidewalks in bid.
7. Contractor to provide backing for crew room and managers office.
8. Existing road sign to remain.
|
|
Job Purchase Information:
|
|
|
|
|
|
|