|
Contact:
|
Brian McDaniel
|
PreBid Date:
|
06/03/2005
1030
|
PreBid Info:
|
Apre-bid conference will be held on Friday, June 3rd, 2005 at Grandview High School at 10:30 a.m. C.D.T. Meet outside, in front of Library, at Project Site.
|
|
Company:
|
BCS Design, Inc
|
Bid Date:
|
06/07/2005
1600
|
Bid Info:
|
Grandview Consolidated School District No.4, 724 Main Street, Grandview, Missouri 64030
|
|
|
Public Notes:
|
The project consists of the following: An existing 3,251 square foot basement space is to be finished out as classroom space. Work includes, but is not limited to, new saw-cut openings in existing concrete foundation wall, new concrete stairs, ramps and retaining walls, aluminum handrails, new interior metal stud walls with impact-resistant gypsum board, hollow metal door and window frames, hollow metal doors, wood doors, suspended acoustical ceilings, painting and mechanical/electrical/plumbing systems.
|
|
Job Purchase Information:
|
Sets of Bidding Documents may be obtained from Kelly Imaging for a Refundable fee of $50.00 per set if plans and specs are retuned to Kelly Imaging in good condition within ten (10) calendar days after bid opening. Make checks payable to BCS Design Inc. Mail checks to: Kelly Imaging, Attn: Distribution, 10840 W 86th Street, Lenexa, KS 66214-1632. Interested parties can review project related data, including the current plan holders list, by visiting the Kelly Imaging web site at www.kellyimaging.net.
|
|
|
|
|
|