Contact:
|
Mike Hart
|
PreBid Date:
|
05/18/2004
14:30
|
PreBid Info:
|
|
|
Company:
|
GBA
|
Bid Date:
|
05/25/2004
15:00
|
Bid Info:
|
|
|
|
Public Notes:
|
The work included in this project is as follows: Furnish and install 1,245 L.F. of 8" ductile iron water pipe; 430 L.F. of 3/4" copper service line; 4" and 8" ductile iron MJ fittings; 11 - 8" MJ gate valves with valve boxes; 3 fire hydrant assemblies; 13 water meters; concrete curbing, driveways and sidewalks; concrete encasement; asphalt street repair; surface restoration and erosion control; sod placement; and all other appurtenances necessary to complete this project.
|
|
Job Purchase Information:
|
Sets of Bidding Documents may be obtained from Kelly Imaging for a Non-Refundable fee of $95.00 per set. Make checks payable to George Butler Associates, Inc. Mail checks to: Kelly Imaging, Attn: Distribution, 10840 W 86th Street, Lenexa, KS 66214-1632.
|
|
Addenda- 05/24/2004 - Addendum #1? Consists of 8 pages of 8 1/2 x 11. This addenda is available to View, Print, Download or Pick-up at Kelly Imaging.
|
|
|
|