|
Contact:
|
Dan Schultze
|
PreBid Date:
|
09/15/2005
|
PreBid Info:
|
At the hospital conference room #2. (Just inside the front entrance to the right)
|
|
Company:
|
Murray Company
|
Bid Date:
|
09/27/2005
1100
|
Bid Info:
|
|
|
|
Public Notes:
|
Phase 1 "MEP Systems Upgrade" - consists of a single story building for the new mechanical equipment. In addition, a three story building will be constructed for a new elevator to be used to provide vertical circulation for staff use and back of house operations. Includes a new loading dock and related site work. New mechanical equipment, including three chillers, cooling tower, pumps, reheat units, fan coil units, air handling units, etc. A new electrical tower, reheat units, fan coil units, air handeling units, ets. A new electricial service to be included. Multiple construction trades (I.e. Dirt work, concrete, carpentry, drywall, and finish trades) will all be required for this phase.
|
|
Job Purchase Information:
|
Sets of Bidding Documents may be obtained from Kelly Imaging to Pre-Qualified Bidders only for a Refundable fee of $100.00 per set if plans are returned to Kelly Imaging in good condition within 15 days after bid opening. Make checks payable to Murray Company. Mail checks to: Kelly Imaging, Attn: Distribution, 10840 W 86th Street, Lenexa, KS 66214-1632.
|
|
Addenda- 09/21/2005 - Addendum #1, #2, #3, Pre-bid meeting notes, and bid instructions consists of 123 pages of 8.5 X 11.
- 09/23/2005 - Addendum #4 Consists of 15 pages of 8.5 X 11.
|
|
|
|