|
Contact:
|
Heidi Thummel
|
PreBid Date:
|
Not furnished
|
PreBid Info:
|
|
|
Company:
|
GBA
|
Bid Date:
|
11/05/2004
1400
|
Bid Info:
|
|
|
|
Public Notes:
|
Installation of 3,576 lf of 18" sanitary sewer pipe over new and existing alignments; Installation of 199 lf of 15" sanitary sewer pipe over new and existing alignments; Installation of 874 lf of 12" sanitary sewer pipe over new and existing alignments; Installation of 2810 lf of 8" sanitary sewer pipe over new and existing allingments; Installation of 1,026 lf of 6" sanitary sewer pipe over new and existing alignments; Installation of 38 pre-cast 4' Dia. manholes; Installation of 4 pre-cast 6' Dia. manholes; Installation of 2 pre-cast 6' Dia. inside drop manholes; Install 2,159 lf of 6.0 min 8" Dia. Cured-In-Place Pipe; Rehabilitation of 36 existing manholes by various methods; Installation of 22 clean-outs and associated service lateral piping; Mill and Overlay 22,203 SY of asphalt pavement on Overland Park Place; Installation of 151 lf of reinforced concrete encasement; Installation of service laterals inside Howell Moldings and United Manufacturing without disruption of the manufacturing processes; Installation of 86 lf of 36" arch storm pipe; Installation of 30 lf of 30" arch storm pipe; Installation of 30 lf of 24" arch storm pipe; Installation of 45 lf of 30" RCP; Installation of 144 lf of 24" RCP; Installation of 7 storm structures; Installation of one large reinforced concrete box structure; and abandoment of 13 existing manholes.
|
|
Job Purchase Information:
|
Sets of Bidding Documents may be obtained from Kelly Imaging for a Non-Refundable fee of $150.00 per set. Make checks payable to George Butler Associates, Inc. Mail checks to: Kelly Imaging, Attn: Distribution, 10840 W 86th Street, Lenexa, KS 66214-1632.
|
|
Addenda- 11/01/2004 - Addendum #1 consists of 2 pages of 8 1/2 x ll.
|
|
|
|