Need Help?
Contact Us At: distribution@drexeltech.com
   Planroom Links
Drexel Technologies Web Site
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
JCCC Regnier Center & Nerman Museum Bid Package #4

JCCC Regnier Center & Nerman Museum Bid Package #4
           Place Order 

 

    

Contact:   Tom Bartelli
PreBid Date:   03/29/2005 1400
PreBid Info:   A pre-bid conference will be held on March 29, 2005 at 2:00 p.m. at the offices of J.E. Dunn Construction Company, Training Center, 901 Charlotte, KC MO.

Company:   JE Dunn Construction Division - Locust St.
Bid Date:   04/14/2005 1400
Bid Info:  

Project Location:

Public Notes:
Addendum 2 has revised bid date, new bid date is April 14 2005, at 1400. We are competitively bidding the following scopes of work for the above referenced project: Rough Carpentry, Finish Carpentry, Sprayed Fire Proofing, Doors/Frames/Hardware, Metal Studs/Drywall, Tile Flooring, Terrazzo Flooring, Stone Flooring, Wood Flooring, Resinous Flooring, Carpet, Painting, Toilet Compartments, Stone Toilet Compartments, Access Flooring System, Fire Protection Specialties, Operable Panel Partitions, Dock Equipment, Window Treatments, Fixed Audience Seating, Fire Suppression Systems, Mechanical (HVAC), Plumbing, and Electrical.



Job Purchase Information:


Addenda
  • 03/24/2005 -  Addendum #1 - Consists of 102 pages of 8 1/2 x 11 and 29 full size drawings.
  • 04/04/2005 -  Addendum #2 - Consist of 141 8.5 X 11, 28 11 X 17, 38 full size plans
  • 04/08/2005 -  Addendum #3 - Consist of 71 pages of 8.5 X 11, and 12 pages of 11 X 17
  • 04/22/2005 -  Addendum #4 - Constists of 8 pages of 8 1/2 by 11.
  • 04/25/2005 -  Addendum #5- Constists of 23 pages of 8 1/2 by 11, 5 pages of 11 by 17, and 7 full size drawings

The complete set of bid documents does not contain large format drawings.