Need Help?
Contact Us At:
distribution@drexeltech.com
[Notification/Error Banner Message Space]
Planroom Links
Drexel Technologies Web Site
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
High Grove Controls
High Grove Controls
Place Order
Contact:
Brian McDaniel
PreBid Date:
03/27/2008
1615
PreBid Info:
A pre-bid conference will be held on Thursday, March 27th, 2008 at 4:15p.m. C.D.T. Meet at Main Entrance to building - South side of building conples, along High Grove Road.
Company:
BCS Design, Inc
Bid Date:
04/03/2008
1500
Bid Info:
District Offices
Project Location:
Public Notes:
The project consists of the following: The addition of Allerton DDC control system to existing rooftop units at High Grove Elementary School.
Job Purchase Information:
Sets of Bidding Documents may be obtained from Drexel Technologies for a
Refundable fee of $50.00
per set if plans and specs are returned to Drexel Technologies in good condition within 10 Days of bid opening. Three sets per General Contractor. Make
checks payable to BCS Design Inc.
. Mail checks to: Drexel Technologies, Attn: Distribution, 10840 W 86th Street, Lenexa, KS 66214-1632.
Addenda
03/31/2008 - Addendum #1 Addendum #1 - Consists of 3 pages of 8 1/2 x 11
Click to View
The complete set of bid documents does not contain large format drawings.
Toll Free
: (888) 202-1301
Lenexa, KS
10840 W. 86th Street
Lenexa, KS. 66214-1632
P
: (913) 371-4430
F
: (913) 371-7128
Kansas City, MO
1911 Central Street
Kansas City, MO. 64108-2023
P
: (816) 471-7176
F
: (816) 471-5407
St. Louis, MO
60 Progress Pkwy.
Maryland Heights, MO. 63043-3202
P
: (314) 872-0900
F
: (314) 985-8555