|
Contact:
|
David Brucker
|
PreBid Date:
|
Not furnished
|
PreBid Info:
|
|
|
Company:
|
Level-4 Engineering LLC
|
Bid Date:
|
01/22/2009
1500
|
Bid Info:
|
|
|
|
Public Notes:
|
The construction of +/- 820 Linear Feet of Greenwood Lane - 134th Place to 133rd Street; begin north of existing intersection at 134th Place and Greenwood Ln and teminate with construction of 3-way intersection at 133rd Street and Greenwood Ln; consisting of grading, asphault, curb & gutter and all necessary appurtenant work to complete the three driving lanes of street conforming to City of Olathe design criteria with grading completed to follow ultimate typical cross-section from Right of Wau to Right of Way. ...and also... The construction of an 8"D.I.P. and all appurtenances along said street construction.
|
|
Job Purchase Information:
|
Full size copies of the contract documents and specifications may be obtained for $55.00 per set (non refundable) from the Issuing Office: Drexel Technologies, 10840 West 86th Street, Lenexa, Kansas 66214-1632, (913) 371-4430. Bidding Documents will be shipped only if the requesting party assumes responsibility for all related shipping charges. Corporate, certified, or cashier's checks shall be made payable to Drexel Technologies.
|
|
|
|
|
|