|
Contact:
|
Jeff Vandel
|
PreBid Date:
|
10/07/2003
1400
|
PreBid Info:
|
|
|
Company:
|
North Kansas City Schools
|
Bid Date:
|
10/16/2003
1400
|
Bid Info:
|
|
|
|
Public Notes:
|
The work described by the drawings and specifications includes in general terms, but is not limited to:
1. Maple Park Middle School
Provide a secure vestibule area, replace flooring, repaint classrooms, upgrade fire alarm and intercom system, improve existing HVAC in system, and provide air conditioning in the gyms, locker room, and kitchen. Provide a elevator addition as Alternate No. 1; and all other work indicated on the drawings and included in these specifications.
2. Fox Hill Elementary School
Provide a secure vestibule area, provide a new kindergarten addition, replace flooring, provide new exterior doors and hardware, balance existing HVAC
System; and all other work indicated on the drawings and included in these specifications.
|
|
Job Purchase Information:
|
Full size plans are available for a $100.00 REFUNDABLE FEE if plans are returned in good condition by November 4, 2003. DEPOSIT CHECK IS TO BE MADE OUT TO North Kansas City School District #74. Checks may be mailed to: Kelly Imaging, 10840 W 86th St., Lenexa KS, 66214
|
|
Addenda- 10/10/2003 - Addendum1 ? Consists of 15 pages of 8 1/2 x 11. This addenda is available to View, Print, Download or Pick-up at Kelly Imaging.
|
|
|
|