|
Contact:
|
Nicole Schmidt
|
PreBid Date:
|
05/27/2010
900
|
PreBid Info:
|
Derrick Thomas Academy
|
|
Company:
|
Turner Construction Company
|
Bid Date:
|
06/08/2010
1400
|
Bid Info:
|
Turner SPD
|
|
|
Public Notes:
|
The work includes resealing and striping of the existing two parking lots, demolition of existing fencing and playground equipment along with new playground equipment. Some areas are to include new base, asphalt and striping for the parking lot along with new basketball hoops, bleachers, scoreboard and a concession stand with a pair of restrooms to service the football facility. New concrete pads, sidewalk, footings and slabs are required. Estimated Value of the Project $515,000
|
|
Job Purchase Information:
|
Full size copies of the contract documents and specifications may be obtained for $56.78 per set (non refundable).
Half size copies of the contract documents and specifications may be obtained for $34.74 per set (non refundable).
Plans and specifications may also be picked up on CD for a Non-Refundable fee of $28.39.
Bidding Documents may be purchased from the Issuing Office: Drexel Technologies, 10840 West 86th Street, Lenexa, Kansas 66214-1632, (913) 371-4430.
Downloads of contract document and specifications are available at no cost.
Bidding Documents will be shipped only if the requesting party assumes responsibility for all related shipping charges. Corporate, certified, or cashier's checks shall be made payable to Drexel Technologies.
|
|
Addenda- 05/26/2010 - Addendum #1 Addendum #1 - Consists of 2 pages of 8.5 x 11 and 4 full size sheets.
- 06/02/2010 - Addendum #2 Addendum #2 - Consists of 5 pages of 8 1/2 x 11 and 1 sheet that is 11 x 17.
- 06/02/2010 - Addendum #3 Addendum #3 - Consists of 2 pages of 8.5 x 11.
|
|
|
|