2025 Buckner Tarsney Trail Construction SW Rock Creek Lane to SW Nelson Drive - Grain Valley, MO

0322006.04
You need to register or login to order prints and download files from this project.

Status

Accepting Bids

Prebid Date 10/9/25 2:00pm
Bid Date 10/29/25 2:00pm

Company & Contacts

Lamp Rynearson
Dan Miller  
816-823-7228

Location

Grain Valley, MO

Sealed Bids will be received by the City of Grain Valley at City Hall, 711 Main Street, Grain Valley, Missouri until the above time. At said place and time, all Bids that have been duly received will be publicly opened and read aloud in the Lower Level Conference Room.

The Work is generally described as follows:

Bid # 2025-02

Buckner Tarsney Trail Construction

SW Rock Creek Lane to SW Nelson Drive

All Bids must be in accordance with the Bidding Documents, including, Drawings, Specifications, and Contract Documents on file at the Community Development Department, located in City Hall, 711 Main Street, Grain Valley, Missouri.

Copies of plans, specifications, bid documents, and other Contract Documents can be seen or purchased on-line at www.drexeltech.com in their eDistribution plan room, additional assistance is available at distribution@drexeltech.com. Information regarding this project can be found under the “Public Jobs” link on the website. Prospective bidders desiring the Contract Documents for use in preparing bids shall obtain a set of such documents from Drexel Technologies, 10840 West 86th Street, Lenexa, KS 66214, telephone number is 913-371-4430. Any questions regarding the project, plans, specification, or bid documents should be directed to Lamp Rynearson, (816) 361-0440.

Bids will be received on a unit price basis.

Each Bid shall be accompanied by a certified check, made payable to the City of Grain Valley, Missouri in an amount not less than five percent (5%) of the total Bid or by a Bid Bond with a Surety licensed to do business in the State of Missouri in the amount of five percent (5%) of the total Bid. This Security may be retained by the Owner until the Contract for the Project has been fully executed.

The Contractor and all subcontractors will be required to comply with all applicable Federal and State labor regulations including Equal Employment Opportunity, Non-segregated Facilities, Minimum Wage Rates and Affirmative Action requirements. The City of Grain Valley hereby notifies all Bidders that it will affirmatively ensure that in any Contract entered into pursuant to this Advertisement, minority business enterprises will be afforded full opportunity to submit Bids without discrimination, regardless of race, color, or national origin in consideration for any award.

Wage rates paid for Work for this Project shall be at least equal to the prevailing wage rates as determined by the Division of Labor Standards of the State of Missouri.

The project contractor and each subcontractor shall require each on-site employee to complete the ten-hour safety program required under Section 292.675, RSMo, within 30 days of beginning any of the work on the project if he or she has not previously completed the program or does not have documentation of having done so.

All bids are subject to the Buy Local/American policy and any other applicable purchasing statutes of the State of Missouri.

No bidder may withdraw its Bid within 90 days after the actual date of the opening of Bids. The City of Grain Valley, Missouri reserves the right to award the Contract by sections, to reject any or all Bids, and to waive any informalities or irregularities therein.

All bidders must be on MODOT’s Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening.

The DBE (Disadvantaged Business Enterprise) Goal is 8.0% - refer to the DBE Submittal Forms and the DBE Program Requirements for Local Programs.

This project will be awarded to the lowest, responsive, responsible bidder.

Owner: City of Grain Valley, Missouri

Date: Publish in Missouri Examiner

September 27th, 2025

PRE-BID CONFERENCE


A pre-Bid conference will be held via Zoom at the above time.

https://us06web.zoom.us/j/82338025233?pwd=XIr02S0OtqMkKO6NezjU0JEt3xbB2R.1

Representatives of Owner will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Owner will transmit to all prospective Bidders of record such Addenda as Owner considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.