View the Bid Tabs for this project
The proposed Work provides for the furnishing of all materials, equipment and labor for the Street Maintenance Project, City of Hutchinson, Kansas, consisting of the following approximate quantities major units of work:Arterial Streets; HMA Surface (Ultra Thin Bonded)(Type A)(OG 70-28) 1,909 Tons, Emulsified Asphalt (EBL) 51 Tons 2" Asphalt Milling 13,335 S.Y., 2" SR 9.5A Overlay (20% RAP)(PG64-28) 1,467 Tons 2" Asphalt Miling 13,335 S.Y., 2" SR 9.5A Overlay (20% RAP)(PG64-28) 1,467 Tons Residential Streets; 0-1.5" Asphalt Edge Milling 7,868 S.Y., 1.5" Asphalt Milling 12,985 S.Y. 1.5" BM-2 Overlay (25% RAP)(PG58-28) 1,315 Tons, 2" BM-2 Overlay (25%RAP)(PG58-28) 1,429 Tons Traffic Control, 4" Concrete Sidewalk, Removals, Curb & Gutter, storm Sewer, other items, work, and appurtenances
|